+971 50 155 6968

info@manzoor.ae

9:00 AM - 6:00 PM, Sun - OFF

Bathroom with white wall tiles and warm-toned mosaic floor tiles

Waterproof First, Tile Second

Bathroom Tiling Dubai

A bathroom is the hardest place to get tiling wrong, because water finds every weakness. Our team tiles bathrooms across Dubai by waterproofing first, setting floors to fall properly towards the drain, and detailing the junctions, niches, and fittings carefully, so the finished bathroom looks good and stays dry behind the tiles.

Skilled Technicians
Fast Turnaround
Workmanship Guarantee
Fixed Upfront Quote
12+
Years Serving Dubai
3-6
Days Typical Bathroom
700+
Bathrooms Tiled
100%
Workmanship Guaranteed

Our Bathroom Tiling Services

Waterproofed, detailed, and tiled to stay dry and look sharp.

Gloved hand working adhesive around a floor drain opening on large tiles

Floors Falling to the Drain

Floors set to fall correctly so water runs away instead of pooling.

Hands measuring and marking a tile around an inspection access plate

Access Panels & Fittings

Neat cuts and clean detailing around plates, taps, and fixtures.

Combed tile adhesive ridges beside a large porcelain tile

Wall & Floor Bedding

Full-bed adhesive suited to wet areas and large-format tiles.

Gloved hand placing blue levelling clips between large porcelain tiles

Even Joints & Flush Tiles

Levelling clips for tight, even joints and a flat finish.

When Your Bathroom Needs Retiling

Tiling problems in wet areas get expensive fast. It is worth booking if you have:

A new bathroom needing waterproofing and tiling
Cracked, loose, or hollow tiles around the shower or bath
Grout that is stained, crumbling, or growing mould
Water pooling on the floor or draining slowly
Damp patches on walls or ceilings below the bathroom
A dated bathroom you want to refresh with new tiles

Bathroom Tiling Work We Handle

Strip & Inspect

Removing old tiles and checking the substrate and plumbing positions.

Waterproofing

Applying a waterproof membrane to floors and wet walls and letting it cure.

Tiling & Detailing

Fixing tiles with correct falls and neat cuts around fittings and drains.

Grout & Seal

Grouting, sealing, and applying flexible sealant at junctions.

How Our Bathroom Tiling Works

1

Book a Visit

Tell us about the bathroom and what you want changed.

2

Inspect & Quote

We inspect the bathroom and give a fixed price.

3

Choose Your Tiles

Agree tiles, layout, and grout colour before work begins.

4

Waterproof & Tile

We waterproof, tile, and seal the bathroom to a finish.

Why Dubai Properties Trust Manzoor Technical Services

Waterproofing First

A membrane under the tiles, because tiles alone do not stop water.

Correct Falls

Floors that drain properly instead of holding puddles.

Every Job Guaranteed

If something is not right, we return and address it at no extra cost.

Getting Ready for Bathroom Tiling

A few details help us plan the work properly.

Choose tiles and grout colour, and order a spare box
Tell us the fittings you plan to keep or replace
Let us know the position of drains, niches, and taps
Arrange alternative bathroom access during the works
Mention past leaks or damp in the bathroom
Confirm building working hours and any water shut-off rules

Areas We Cover in Dubai

Wherever you are in Dubai, our team can reach you — including:

Downtown Dubai
Dubai Marina
Business Bay
Jumeirah
Al Barsha
Deira
Mirdif
Arabian Ranches

Frequently Asked Questions

Do bathrooms need waterproofing under the tiles?

Yes, tiles and grout are not waterproof on their own, so we apply a membrane to floors and wet walls before tiling.

How do you make sure water drains properly?

We set the floor to a slight fall towards the drain so water runs away instead of pooling.

Can you retile over old bathroom tiles?

Occasionally, but in wet areas we usually strip back to check the waterproofing and substrate first.

Can you deal with mould on grout?

We can remove stained grout and regrout with a suitable product, and address the damp or ventilation causing it where possible.

How long does a bathroom tiling job take?

Most bathrooms take three to six days, including waterproofing cure time.

Do you offer any guarantee on your work?

Yes. Every job comes with a workmanship guarantee, and we return and address any issue that appears within the warranty period at no extra charge.

Book Your Bathroom Tiling Today

Waterproofed, well-finished bathrooms across all Dubai areas — fixed quotes, full workmanship guarantee.

Contact Us